{"schemaVersion":"1.0","schema":"https://ahmednadhir.com/api/signal-to-state/schema","canonical":"https://ahmednadhir.com/signal-to-state/ci-pidacc-2026-001","formats":{"html":"https://ahmednadhir.com/signal-to-state/ci-pidacc-2026-001","pdf":"https://ahmednadhir.com/records/signal-to-state-ci-pidacc-2026-001-revision-1-2-2026-10-01.pdf","json":"https://ahmednadhir.com/api/signal-to-state/records/ci-pidacc-2026-001","csv":"https://ahmednadhir.com/api/signal-to-state/records/ci-pidacc-2026-001?format=csv"},"record":{"id":"CI-PIDACC-2026-001","slug":"ci-pidacc-2026-001","title":"Côte d’Ivoire’s Niger Basin climate programme: following additional finance into delivery","shortTitle":"Côte d’Ivoire · PIDACC/BN additional financing","jurisdiction":"Côte d’Ivoire","evidenceRegion":"Eight Ivorian regions in the Centre and north-west, within the Niger Basin programme","opened":"29 September 2026","openedIso":"2026-09-29","reviewed":"1 October 2026","reviewedIso":"2026-10-01","revision":"1.2","state":"Baseline disbursement and execution reported; additional-finance trail open","territory":"cote-divoire","hazard":"climate-resilience-and-landscape-restoration","systems":["water","forestry","agriculture","rural-livelihoods","public-finance"],"activeSignal":"Côte d’Ivoire has ratified and launched US$24.07 million in additional financing for its component of the Integrated Programme for Development and Adaptation to Climate Change in the Niger Basin (PIDACC/BN). An official ministry report now places the existing programme above 80% physical execution and reports more than FCFA 10 billion disbursed from its initial FCFA 13 billion envelope. That baseline does not establish disbursement of the additional package. The next public tests are the dated infrastructure deliveries promised for October to December 2026 and an attributable cash, procurement and output trail for the new financing.","scopeNote":"This record concerns the Ivorian component of PIDACC/BN. It does not treat programme-wide regional finance or activity in other Niger Basin countries as evidence of delivery in Côte d’Ivoire."},"currentAssessment":{"latestChange":{"date":"1 October 2026","title":"The legal chronology is corrected: ratification took place on 3 June, before the September launch.","detail":"The Council of Ministers communiqué is dated 3 June 2026, not 28 September as previously recorded. It covers two loans and a grant signed on 13 March. The 16 September launch and 28 September African Development Bank announcement are separate events. The existing-programme baseline and the open additional-finance cash trail are unchanged."},"nextDecision":{"title":"Deliver the promised infrastructure by the October–December deadlines and identify which finance paid for it.","timing":"Livestock loading station inauguration: 15 October 2026. Gbéléban and Gbémou landing facilities: no later than 30 November 2026. Structural infrastructure completion: 31 December 2026. Additional-finance programme closing date: 31 December 2027.","detail":"The decision trace now turns on completion and handover evidence for the dated works, together with contracts, payments and financing attribution. For the additional package, it still requires component-level drawdown, regional work plans, procurement awards, counterpart releases and beneficiary-level delivery evidence."},"responsibility":{"title":"The Ministry of Water and Forests and its national coordination unit hold the Ivorian implementation chain.","detail":"Regional monitoring committees, regional councils and decentralised state services support delivery. The Niger Basin Authority coordinates the regional programme, while the African Development Bank Group and climate funds provide financing and supervision."},"verifiedAction":{"title":"Ratification, launch, field supervision and an official existing-programme execution baseline are verified.","detail":"Official records establish financing agreements, implementation instruments, eight intervention regions, a launch and post-launch supervision. The ministry now reports more than FCFA 10 billion disbursed and physical execution above 80% under the initial envelope. Transaction records and output attribution remain open."},"openEvidence":{"title":"The additional package’s drawdown, regional allocations, awards and attributable outputs remain open.","detail":"The official aggregate for the initial programme is not a substitute for loan- and grant-level transaction records. The file still needs the government counterpart release, procurement awards, regional contracts, payment and completion records, and outcome indicators tied specifically to the additional financing."}},"decisionTrace":[{"code":"T0","stage":"Signal","question":"What consequential transition has entered the public record?","finding":"The Ivorian component of PIDACC/BN has moved from an existing resilience programme into an additional-financing phase covering climate adaptation, landscape restoration and natural-resource management in eight regions.","status":"Verified","href":"#signal"},{"code":"T1","stage":"Trigger","question":"What official action activated the new phase?","finding":"The agreements were signed on 13 March 2026. The Council of Ministers adopted three ratification decrees on 3 June, before the additional-financing launch on 16 September. The African Development Bank announcement followed on 28 September.","status":"Verified","href":"#trigger"},{"code":"T2","stage":"Authority","question":"Which institutions carry responsibility?","finding":"The Ministry of Water and Forests and the PIDACC/BN National Coordination Unit lead national implementation. Regional monitoring committees connect prefects, regional councils, decentralised technical services, financial control and programme accounting. The Niger Basin Authority coordinates the regional component.","status":"Mapped","href":"#authority"},{"code":"T3","stage":"Commitment","question":"What finance and implementation authority are established?","finding":"The launched package totals US$24.07 million: an African Development Fund loan of US$6.87 million, a Forest Investment Programme loan of US$12.6 million and grant of US$1.9 million, plus a US$2.7 million Ivorian counterpart contribution.","status":"Verified","href":"#finance"},{"code":"T4","stage":"Execution","question":"What has moved into implementation?","finding":"For the initial programme envelope, the ministry reports more than FCFA 10 billion disbursed and physical execution above 80%, while an equipment handover and field supervision are also documented. Completion of the dated infrastructure commitments, transaction-level support and outputs attributable to the additional package remain open.","status":"Verified","href":"#execution"},{"code":"T5","stage":"Outcome","question":"Can the additional financing’s public effects be assessed?","finding":"Not yet. Existing programme outputs form a baseline, but the additional-financing phase requires separate evidence of hectares restored, water and livelihood assets delivered, beneficiaries reached and resilience outcomes by the end of 2027.","status":"Not assessable at this stage","href":"#outcome"}],"materialChanges":[{"date":"1 October 2026","dateIso":"2026-10-01","context":"Côte d’Ivoire · correction to legal chronology","changed":"The Council of Ministers communiqué is dated 3 June 2026. Earlier revisions incorrectly recorded ratification on 28 September, the date of the separate African Development Bank launch announcement. Three decrees cover two loans and a grant signed on 13 March.","source":"Côte d’Ivoire Council of Ministers · 3 June communiqué","sourceHref":"https://web.sgg.gouv.ci/publications/conseils-des-ministres/details/3300","decision":"Read the September launch against legal authority already established in June. The next tests remain scheduled infrastructure delivery and attributable additional-finance transactions.","assessment":"Legal chronology corrected. The existing-programme baseline, verified action count and open additional-finance delivery assessment are unchanged. The outgoing revisions remain available as originally published.","effect":"Chronology corrected; assessment unchanged"},{"date":"30 September 2026","dateIso":"2026-09-30","context":"Côte d’Ivoire · existing-programme execution and delivery deadlines","changed":"An official notice published on 23 September reports physical execution above 80% and more than FCFA 10 billion disbursed from the initial FCFA 13 billion envelope. It also sets infrastructure delivery milestones for 15 October, 30 November and 31 December 2026.","source":"Ministry of Water and Forests","sourceHref":"https://www.eauxetforets.gouv.ci/actualite/mise-en-oeuvre-du-pidacc-lautorite-du-bassin-du-niger-salue-les-performances","decision":"The implementation chain must complete and evidence the promised infrastructure on schedule, identify the contracts and payments behind the reported aggregate, and keep the additional-finance cash trail separate.","assessment":"Baseline disbursement and physical execution are now verified as official programme reporting. Disbursement and attributable outputs under the US$24.07 million additional package remain open evidence.","effect":"Assessment changed"},{"date":"29 September 2026","dateIso":"2026-09-29","context":"Côte d’Ivoire · additional climate-resilience finance","changed":"The official financing package is now supported by a ratification record, a programme launch, named national and regional implementing structures and a defined closing date.","source":"Council of Ministers; Ministry of Water and Forests; African Development Bank Group","sourceHref":"https://web.sgg.gouv.ci/publications/conseils-des-ministres/details/3300","decision":"The responsible institutions must now publish releases, region-specific work plans, procurement awards and completed outputs under the additional financing.","assessment":"A new record is admitted. Finance and programme activation are verified; subproject-level disbursement and delivery under the additional package remain open evidence.","effect":"Record opened"}],"evidence":[{"horizon":"Programme transition","source":"Côte d’Ivoire Council of Ministers","published":"3 June 2026","validFor":"Additional-financing agreements","finding":"Three decrees ratify the US$12.6 million loan, the African Development Fund loan of 5 million Units of Account, and the US$1.9 million grant, all signed on 13 March 2026.","status":"Verified legal decision","href":"https://web.sgg.gouv.ci/publications/conseils-des-ministres/details/3300"},{"horizon":"Operational activation","source":"Ministry of Water and Forests","published":"18 September 2026","validFor":"Launch on 16 September 2026","finding":"The additional-financing phase was launched in Bouaké and equipment was handed to programme actors.","status":"Verified programme activation","href":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel"},{"horizon":"Financing and timetable","source":"African Development Bank Group","published":"28 September 2026","validFor":"Programme closing date 31 December 2027","finding":"The financing composition, programme geography and implementation horizon are defined.","status":"Verified financing framework","href":"https://www.afdb.org/en/news-and-events/press-releases/cote-divoire-and-african-development-bank-group-launch-24-million-investment-strengthen-climate-resilience-and-restore-forest-landscapes-97094"},{"horizon":"Existing-programme execution baseline","source":"Ministry of Water and Forests","published":"23 September 2026","validFor":"Initial envelope and October–December 2026 delivery commitments","finding":"The ministry reports physical execution above 80% and more than FCFA 10 billion disbursed from the initial FCFA 13 billion envelope; it also records dated infrastructure delivery commitments.","status":"Verified official implementation report","href":"https://www.eauxetforets.gouv.ci/actualite/mise-en-oeuvre-du-pidacc-lautorite-du-bassin-du-niger-salue-les-performances"}],"reach":[{"name":"Bagoué","jurisdiction":"Bagoué","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Kabadougou","jurisdiction":"Kabadougou","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Folon","jurisdiction":"Folon","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Gbêkê","jurisdiction":"Gbêkê","zone":"Centre","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Bélier","jurisdiction":"Bélier","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Iffou","jurisdiction":"Iffou","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Moronou","jurisdiction":"Moronou","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"N’Zi","jurisdiction":"N’Zi","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."}],"jurisdictionEvidence":[{"name":"Bagoué","jurisdiction":"Bagoué","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Kabadougou","jurisdiction":"Kabadougou","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Folon","jurisdiction":"Folon","zone":"North-west","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Gbêkê","jurisdiction":"Gbêkê","zone":"Centre","action":true,"status":"Execution reported","finding":"Launch or post-launch programme action is documented in this file.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme launch or supervision notice","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Bélier","jurisdiction":"Bélier","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Iffou","jurisdiction":"Iffou","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"Moronou","jurisdiction":"Moronou","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."},{"name":"N’Zi","jurisdiction":"N’Zi","zone":"Centre","action":false,"status":"National programme only","finding":"The region is within the official programme geography; additional-financing execution is not yet documented here.","source":"Ministry of Water and Forests · PIDACC/BN programme notices","sourceHref":"https://www.eauxetforets.gouv.ci/projet/pidacc-16","published":"Reviewed 1 October 2026","evidenceBasis":"Official programme geography","openEvidence":"Region-specific work plan, procurement award, contract and completed delivery under the additional financing.","finance":"No region-specific allocation or release is evidenced in this file."}],"authority":[{"level":"National implementation","institutions":"Ministry of Water and Forests; PIDACC/BN National Coordination Unit","role":"Coordinate the Ivorian component, prepare implementation instruments, supervise subprojects and report programme delivery.","basis":"Ministry launch and programme notices","href":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel"},{"level":"Regional implementation and oversight","institutions":"Regional prefects, regional councils, decentralised technical services, financial controller and programme accountant","role":"Review progress, validate subprojects and align programme delivery with the eight intervention regions.","basis":"2026 regional monitoring committee sessions","href":"https://www.eauxetforets.gouv.ci/projet/pidacc-16"},{"level":"Regional programme coordination","institutions":"Niger Basin Authority","role":"Coordinate the multinational PIDACC/BN regional component; national implementation remains the responsibility of each participating state.","basis":"African Development Bank financing launch","href":"https://www.afdb.org/en/news-and-events/press-releases/cote-divoire-and-african-development-bank-group-launch-24-million-investment-strengthen-climate-resilience-and-restore-forest-landscapes-97094"},{"level":"Finance and supervision","institutions":"African Development Fund; Forest Investment Programme of the Strategic Climate Fund; Government of Côte d’Ivoire","role":"Provide the loan, grant and counterpart components and supervise compliance with the financing and programme framework.","basis":"Ratified financing agreements and AfDB launch statement","href":"https://web.sgg.gouv.ci/publications/conseils-des-ministres/details/3300"}],"finance":[{"label":"Initial PIDACC/BN envelope","amount":"FCFA 13 billion","status":"More than FCFA 10 billion reported disbursed","finding":"The Ministry of Water and Forests reports the aggregate disbursement and physical execution above 80% for the existing programme. The file does not yet contain transaction-level records, a regional allocation schedule or evidence that this aggregate belongs to the additional-financing package."},{"label":"African Development Fund loan","amount":"US$6.87 million","status":"Ratified and launched","finding":"The Council of Ministers records ratification of the loan agreement. The public file does not yet show the drawdown schedule, amount released or expenditure by subproject."},{"label":"Forest Investment Programme loan","amount":"US$12.6 million","status":"Launched; release evidence open","finding":"The AfDB launch statement identifies the loan component. Component-level disbursement, regional allocation and payment records have not yet been entered in this file."},{"label":"Forest Investment Programme grant","amount":"US$1.9 million","status":"Ratified and launched","finding":"The Council of Ministers records ratification of the grant agreement. Ratification is not treated as proof that the full grant has been disbursed or spent."},{"label":"Government counterpart contribution","amount":"US$2.7 million","status":"Committed; release evidence open","finding":"The AfDB launch statement identifies the Ivorian contribution. The appropriation, release and expenditure trail remain to be published or entered in this file."}],"response":[{"date":"10–14 August 2026","action":"Standard contracts, conventions and advance procurement plans for the additional financing were validated.","actor":"PIDACC/BN National Coordination Unit","status":"Verified preparation","href":"https://www.eauxetforets.gouv.ci/projet/pidacc-26"},{"date":"16 September 2026","action":"Additional financing was officially launched in Bouaké and equipment was handed to programme actors.","actor":"Ministry of Water and Forests; African Development Bank; programme partners","status":"Verified activation","href":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel"},{"date":"17–19 September 2026","action":"A post-launch supervision mission visited programme activity in Kabadougou, Folon and Bagoué.","actor":"PIDACC/BN National Coordination Unit and African Development Bank mission","status":"Verified supervision","href":"https://eauxetforets.gouv.ci/projet/pidacc-32"},{"date":"Reported 23 September 2026","action":"The Ministry of Water and Forests reported more than FCFA 10 billion disbursed from the initial FCFA 13 billion envelope and physical execution above 80%.","actor":"Ministry of Water and Forests; Niger Basin Authority","status":"Verified official report","href":"https://www.eauxetforets.gouv.ci/actualite/mise-en-oeuvre-du-pidacc-lautorite-du-bassin-du-niger-salue-les-performances"},{"date":"15 October–31 December 2026","action":"The parties set delivery milestones: livestock loading station inauguration on 15 October, Gbéléban and Gbémou landing facilities by 30 November, and structural infrastructure completion by 31 December.","actor":"Ministry of Water and Forests; Niger Basin Authority; PIDACC/BN implementation chain","status":"Committed; completion evidence due","href":"https://www.eauxetforets.gouv.ci/actualite/mise-en-oeuvre-du-pidacc-lautorite-du-bassin-du-niger-salue-les-performances"},{"date":"From 2027","action":"More than 650 Centre-zone subprojects are reported as validated for implementation under the additional financing.","actor":"Regional monitoring committees","status":"Planned; awards and delivery open","href":"https://www.eauxetforets.gouv.ci/projet/pidacc-16"}],"versions":[{"version":"1.2","date":"1 October 2026","change":"The legal chronology is corrected: ratification took place on 3 June, before the September launch. Financing and delivery assessment unchanged.","availability":"Current record","href":"/signal-to-state/ci-pidacc-2026-001"},{"version":"1.1","date":"30 September 2026","change":"Added the official existing-programme disbursement and execution baseline and the October–December infrastructure delivery milestones; kept additional-finance disbursement and output attribution open.","availability":"Preserved snapshot","href":"/signal-to-state/ci-pidacc-2026-001/versions/1.1"},{"version":"1.0","date":"29 September 2026","change":"The record opened after the additional-financing loan and grant were ratified and the programme launch, implementation structure and timetable were confirmed.","availability":"Preserved snapshot","href":"/signal-to-state/ci-pidacc-2026-001/versions/1.0"}],"sources":[{"name":"Côte d’Ivoire Council of Ministers","role":"Ratification of the additional-financing loan and grant agreements","href":"https://web.sgg.gouv.ci/publications/conseils-des-ministres/details/3300"},{"name":"Ministry of Water and Forests","role":"Programme launch, national coordination, regional monitoring and field supervision","href":"https://eauxetforets.gouv.ci/actualite/pidacc/pidaccbn-la-cote-divoire-lance-le-financement-additionnel-et-remet-du-materiel"},{"name":"Ministry of Water and Forests · implementation report","role":"Initial-envelope disbursement, physical execution and dated infrastructure delivery commitments","href":"https://www.eauxetforets.gouv.ci/actualite/mise-en-oeuvre-du-pidacc-lautorite-du-bassin-du-niger-salue-les-performances"},{"name":"African Development Bank Group","role":"Financing composition, programme geography, beneficiaries and closing date","href":"https://www.afdb.org/en/news-and-events/press-releases/cote-divoire-and-african-development-bank-group-launch-24-million-investment-strengthen-climate-resilience-and-restore-forest-landscapes-97094"},{"name":"PIDACC/BN project appraisal report","role":"Programme design, financing framework and implementation timetable","href":"https://www.afdb.org/en/documents/cote-divoire-additional-financing-integrated-development-and-climate-change-adaptation-programme-niger-bassin-pidacc/bn-cote-divoire-component-project-appraisal-report"}],"licenceNote":"Original editorial analysis may be cited with attribution. Source documents remain subject to their issuing institutions’ terms."}