Assessment and evidence retained
Earlier rains shorten the preparedness window; Wajir procurement and Makueni’s funding requirement enter the record.
The 30 September meteorological bulletin advances onset guidance for northern and south-eastern counties and describes coastal rains as continuing from September. A national agency’s Wajir flood-control tender and Makueni’s KSh152 million preparedness estimate add specific procurement and financing decisions. Neither establishes completed protection.
Activate local readiness now, resolve the Wajir tender, and identify the finance behind Makueni and Malindi’s commitments.
County authorities need dated evidence of stocks, evacuation arrangements and service readiness. The Northern Water Works Development Agency must establish the tender outcome and works timetable. Makueni’s executive must identify approved resources and releases; Kilifi’s executive must provide the Malindi roadmap. Farmer advisories and the IGAD country-level annex remain open.
Northern counties: first–second week of October; south-eastern counties: second–third week; coastal rains continue from September. The Wajir tender’s stated closing date was 30 September; no award date or Malindi hearing date is evidenced.
County executives hold local readiness duties; the Northern Water Works Development Agency owns the Wajir procurement.
National ministries and county services retain sector duties. The meteorological authority supplies forecasts; the Kenya Agricultural and Livestock Research Organisation and participating organisations support farmer advice. Makueni’s executive leads resource mobilisation with partners. Kilifi’s executive and Malindi Municipality answer the Senate sanitation direction. Wajir’s national-agency tender is not a county procurement.
Updated onset guidance, a flood-control tender and a county resource-mobilisation conference are verified; delivery remains uneven.
The record contains 14 verified response entries, including evidence production, directions and procurement. These are not 14 completed interventions. Thirteen counties retain reported execution; procurement is evidenced in Kisii and, through a national agency, Wajir. Makueni’s conference establishes a financing requirement, not an appropriation.
Awards, approved budgets, releases and completed local protection remain open.
The Wajir award, contract value, work programme and payments; Makueni’s approved financing and releases; Malindi’s works roadmap and completion; farmer receipt; the IGAD country-level annex; and wider county stocks and delivery records are still needed.
Response entries
October bulletin issued with earlier onset guidance
30 September · Kenya Meteorological Service Authority · Verified
Masalale–Kilkey flood-control tender advertised in Eldas, Wajir
14 September; verified 2 October · Northern Water Works Development Agency · Verified
Preparedness partners’ conference held and KSh152 million requirement published
30 September; published 1 October · Makueni County Government · Verified
Senate committee directed a Malindi sanitation response and resolved to call for the Governor’s roadmap, budget commitments and timetable
Reported 24 September · Senate Standing Committee on Devolution and Intergovernmental Relations · Kilifi County Executive · Verified
Forecast-to-Farmer proof of concept launched for authorised four-week forecasts to be translated into agricultural advice during the short rains
22–23 September · Kenya Meteorological Department · Kenya Agricultural and Livestock Research Organisation · participating advisory organisations · Verified
Regional October–December outlook and technical statement published
18 August · Climate Prediction and Applications Centre of the Intergovernmental Authority on Development · Verified
Kenya October–December seasonal outlook published
31 August · Kenya Meteorological Department · Verified
Seven national preparedness measures reported under the national contingency approach
1 September · Ministry of Interior · National Disaster Operations Centre · national and county partners · Verified
County plan, hotspots and evacuation centres reported; response-partner supplies and equipment positioned
7 September · Garissa County structures · National Drought Management Authority · Kenya Red Cross · Reported
Tender notice published for El Niño preparedness materials for Community Health Promoters
7 September · Kisii County · Verified
Health Sector El Niño Contingency Plan activation confirmed
8 September · Ministry of Health · Kenya National Public Health Institute · county health authorities · partners · Verified
Multi-Hazard Contingency Plan refinement and county risk-zone validation documented
8 September · Siaya County · Verified
All 47 counties directed to map flood-prone areas, identify safer evacuation grounds and prepare response strategies
10 September · National government · county governments · National Government Administration Officers · Verified
KSh2.1 billion livestock preparedness and anticipatory-action plan launched for 24 counties
10 September · Ministry of Agriculture and Livestock Development · county livestock functions · Reported
County-by-county reporting documents works, stocks, machinery, evacuation preparation, committees and infrastructure gaps
11 September · Multiple county and national actors · Reported
Construction-site drainage restriction issued and 3,000-person drain-clearance deployment announced
12 September · Mombasa County · Reported
All-county health preparedness advisory issued with operational measures for emergency coordination, facilities, stocks, surveillance, water safety, referrals and continuity of care
15 September · Ministry of Health · county health authorities · public-health institutions and partners · Verified
High-Level Call to Action adopted, committing member states to activate contingency plans, pre-position supplies, strengthen surveillance and link anticipatory finance to agreed triggers
17 September · Intergovernmental Authority on Development · Climate Prediction and Applications Centre · participating governments and partners · Verified
Regional Preparedness and Early Action Technical Annex with country priorities, responsibilities and timelines
Open · Intergovernmental Authority on Development · member states · Open evidence
Published county strategies, national sector-plan documents and disaggregated assignments
Open · National ministries · county governments · Open evidence
Budget releases, procurement awards, work orders and completed delivery records
Open · National and county finance and implementing authorities · Open evidence
Finance
Wajir flood-control procurement
The national agency reports receiving funds but the amount and release trail are not evidenced here. KSh3 million is tender security, not an allocation or contract price. Award, payment and completion remain open.
Makueni preparedness requirement
The county projects KSh152 million and seeks partner resources. This is a requirement, not verified budget approval or disbursement.
Malindi flood mitigation
The municipality reported redirecting capital projects. No approved revision, release, award or payment is evidenced by that statement.
Forecast-to-Farmer pilot
The KMD release identifies a commitment charter, technical partners and supporting organisations, but does not publish a Kenyan appropriation, procurement award, contract value or disbursement for the proof of concept. Existing partner programmes and their reach are not treated as new finance or delivery under this pilot.
Disaster-risk financing policy
Kenya’s Disaster Risk Financing Strategy 2026–2030 provides for different financing instruments at different levels of risk and for finance to be arranged in advance. It provides context; it does not show that money has been released for this forecast.
Reported emergency-finance framework
Reuters reported on 10 September that Kenya and the World Bank are finalising a framework that could permit rapid financing for an eligible emergency, including El Niño. No official project document, signed instrument, amount, appropriation or disbursement was publicly available for this assessment.
National livestock plan
A KSh2.1 billion preparedness and anticipatory-action plan is reported for 24 counties. The official plan, budget authority, financing source, county shares, release status and implementation schedule were not publicly available for this assessment.
County allocations
Reports identify KSh20 million in Mombasa, KSh44.2 million in Migori, KSh27.7 million in Murang’a, KSh29 million in Meru and KSh20 million in Nyeri. Allocation is not treated as release, expenditure or delivery.
Procurement
Kisii County published an El Niño preparedness-materials tender for Community Health Promoters. Tender documents, award, contract value, payment and delivery remain open.
Local execution
County and partner sources report works, stocks, equipment, farm inputs, assessments and machinery in 13 counties. Coverage, quantities, expenditure, completion and independent verification remain incomplete.
Material-change register
2 October 2026 · Decision window shortened
Kenya · revised onset guidance, verified 2 October
The monthly bulletin advances northern onset from the second–third to the first–second week of October and south-eastern onset from the third–fourth to the second–third week. Coastal rains now continue from September rather than beginning in the second–third week of October.
Accelerate county stocks, drainage, evacuation and service-readiness decisions; check local short-range warnings.
Preparedness lead time is shorter. The enhanced-rainfall seasonal outlook and uneven-delivery assessment remain; the forecast is not evidence of a local flood or completed readiness.
Kenya Meteorological Service Authority · October bulletin, issued 30 September; listed 1 October2 October 2026 · Procurement evidenced
Wajir · national-agency procurement newly verified 2 October
The Northern Water Works Development Agency’s notice dated 14 September advertised Masalale–Kilkey flood-control works in Eldas, with a stated closing date of 30 September. The tender document specifies water pans, dykes, gabions and a box culvert.
Establish the tender outcome, contract price, funding trail and achievable works timetable.
Wajir now has primary procurement evidence alongside county planning. The agency says funds were received but supplies no transaction trail here. No award, payment or completed protection is verified; a direct causal link to the seasonal forecast is not asserted.
Northern Water Works Development Agency · tender NWWDA/T/CW/001/2026-20272 October 2026 · Financing requirement specified
Makueni · resource mobilisation on 30 September
The county published a KSh152 million preparedness estimate following a partners’ conference in Wote.
Identify approved county and partner contributions, release dates and assigned evacuation and essential-service measures.
A quantified requirement is now public. It is not evidence that KSh152 million was appropriated, released or spent. The county remains at planning stage in this file.
Makueni County Government · published 1 October; event 30 September1 October 2026 · Local accountability strengthened
Kilifi County · Malindi sanitation accountability
A Parliament notice published on 24 September records a Senate committee direction for Malindi sewerage and a request for a roadmap, budget commitments and timeline. The underlying visit date is unspecified.
Kilifi’s executive must identify the works, finance and timetable, and supply evidence of implementation before onset; no hearing date is stated.
The local accountability trace is stronger. Municipal statements about reallocation and cleaning remain claims; no release or completion evidence is established here. The wider uneven-preparedness assessment is unchanged.
Parliament of Kenya · Senate oversight notice23 September 2026 · Agricultural delivery pathway verified
Kenya agriculture · forecast-to-advice delivery pathway
The Kenya Meteorological Department published a Forecast-to-Farmer pilot for the October–December short rains. It will make authorised, localised four-week forecasts available through an application programming interface for translation and dissemination by participating extension, research, media, SMS and digital advisory channels.
KMD and participating organisations now need to show where the pilot operates, when authorised forecasts and advisories are issued, which farmers receive them, whether the information is understood and useful, and what operational lessons will shape the March–May 2027 rollout.
A national agricultural climate-service commitment and delivery architecture are now verified. The announcement does not establish a new public appropriation, procurement, farmer-level receipt, behaviour change or outcome. Wider Kenyan preparedness finance and county execution remain open.
Kenya Meteorological Department · Forecast-to-Farmer pilot18 September 2026 · Regional commitment verified
Greater Horn · adopted regional preparedness commitment
IGAD published the High-Level Call to Action adopted on 17 September. Member states commit to activate national and subnational contingency plans before the rains, pre-position essential supplies, strengthen health and livestock surveillance, protect critical infrastructure and connect anticipatory finance to agreed triggers.
Kenya now needs to identify which national and county plans are activated, who owns each action, which thresholds release finance, what supplies are pre-positioned and what evidence will be reported before and during the October–December season.
The regional decision outcome is now verified and strengthens the commitment stage of the trace. It does not establish a Kenyan appropriation, release, procurement or completed delivery. The accompanying Technical Annex, said to contain country priorities, responsibilities and timelines, remains open evidence.
Intergovernmental Authority on Development · High-Level Call to Action17 September 2026 · Regional outcome remains open
Greater Horn · regional ministerial decision point
The official event page now marks the 15–17 September High-Level Ministerial Forum as ended. It had identified an IGAD Ministerial Call to Action and a Regional Preparedness and Early Action Technical Report as intended outputs, but neither document was linked or otherwise located in the authoritative sources reviewed on 17 September.
IGAD and ICPAC need to publish the endorsed text, named responsibilities, anticipatory-finance arrangements and delivery dates so that the regional decision can be assessed and followed into national action.
The scheduled regional decision window has passed, but its substantive result is not yet assessable from the published record. Kenya’s preparedness assessment is unchanged; publication of the two expected outputs is now an immediate evidence test.
Climate Prediction and Applications Centre · ministerial forum notice15 September 2026 · Health trigger strengthened
Kenya health sector · all-county operating instruction
The Ministry of Health issued an advisory to all 47 counties specifying emergency coordination, protection of at-risk health facilities, medicine and vaccine availability, disease surveillance, drinking-water safety, malaria prevention, ambulance and referral readiness, nutrition, continuity of essential services, mental-health support and public communication.
County health authorities now need to show which coordination structures are active, which facilities and populations are prioritised, what stocks and referral arrangements are in place, and how the measures are financed and verified.
The evidence moves health preparedness beyond confirmation of a national plan to a more specific operating instruction. It strengthens the national trigger without establishing county implementation or readiness.
Kenya News Agency · Ministry of Health preparedness advisory12 September 2026 · County preparations are uneven
National review of county preparedness
County-level evidence published between 17 August and 12 September presents markedly different stages of preparedness across Kenya: reported execution in 13 counties, procurement in Kisii, directives or planning in 20 counties, and substantial gaps elsewhere.
County plans need to identify the responsible office, funded measure, procurement or work instruction, delivery date and public evidence of completion before the October rains.
Preparedness activity is more extensive than earlier evidence showed, although its depth varies sharply. Five counties appear only in national programme announcements, seven have no recent county-specific public record, and one has a reported implementation gap.
Climate Preparedness Record · 47-county evidence register12 September 2026 · Mombasa response specified
Mombasa County · urban drainage and flood prevention
From 14 September, Mombasa will restrict roadside construction mixing that obstructs drainage. The Governor also announced a phased deployment of 3,000 young people to clear drains, culverts and waterways after flooding disrupted access in several neighbourhoods.
Enforcement records, deployment rosters, named work sites and completion reports will determine whether the measures reduce obstruction before heavier rainfall.
The directive and deployment announcement constitute a formal county response. Evidence of mobilisation, expenditure and completed clearance remains unavailable.
Kenyans.co.ke · Mombasa flood-prevention directive12 September 2026 · National preparedness mandate established
Kenya · all-county readiness and livestock preparedness
The national government directed all 47 counties to map flood-prone areas, identify safer evacuation grounds and prepare response strategies. A separate KSh2.1 billion livestock preparedness plan was reported for 24 counties.
County strategies, the official livestock plan, county allocations, releases and delivery schedules are required to establish how the national direction will be carried out.
The national instruction and reported sector commitment establish a preparedness mandate. County compliance, sector allocations and the movement of funds remain unclear.
Kenya News Agency · all-county preparedness direction12 September 2026 · Garissa preparedness evidence strengthened
Garissa County · flood readiness and emergency response
Garissa reported a preparedness plan, mapped hotspots and evacuation centres, and established weekly coordination. The Kenya Red Cross reported that first-line responders and emergency supplies had been positioned, with boats and vehicles available or on standby.
The county plan, resource inventory, site-level coverage and financing are needed to establish the scale and durability of the reported preparations.
Garissa has identifiable planning and reported mobilisation. Quantities, county financing and independent confirmation of delivery remain unavailable.
The Star · Garissa preparedness report12 September 2026 · Regional decision date confirmed
Greater Horn · regional preparedness and anticipatory finance
The Climate Prediction and Applications Centre of the Intergovernmental Authority on Development scheduled a High-Level Ministerial Forum on El Niño preparedness for 15–17 September. The intended outputs are a ministerial call to action and a regional preparedness and early-action technical report.
The forum is expected to identify preparedness measures, responsible institutions, anticipatory-finance arrangements and delivery deadlines before the October–December season.
The regional decision date and convening responsibility are confirmed. Its proposed outputs will require assessment after publication.
Climate Prediction and Applications Centre of the Intergovernmental Authority on Development · High-Level Ministerial Forum11 September 2026 · Health contingency planning confirmed
Kenya health sector · El Niño contingency planning
The World Health Organization (WHO) confirmed that the Ministry of Health had activated a Health Sector El Niño Contingency Plan covering surveillance, laboratory readiness, water and sanitation, risk communication and continuity of essential services.
The plan now requires county assignments, responsible institutions, resources and an implementation timetable before the October–December rains.
National health preparedness has moved into an active planning phase. The plan document, county assignments, finance, procurement and delivery records remain unavailable.
WHO Kenya · health-system preparedness11 September 2026 · Mandera planning confirmed
Mandera County · scenario planning and early action
Mandera County reported that it was developing a participatory scenario plan with the World Food Programme (WFP) and other partners to define likely scenarios and early actions.
The completed plan needs to identify multi-sector priorities, selected early actions, responsible institutions and the resources required for implementation.
A county preparedness process is confirmed. The notice provides no completed plan, financing, procurement or field-delivery evidence.
County Government of Mandera · preparedness notice11 September 2026 · North-eastern risk clarified
North-eastern Kenya · sector guidance for enhanced rainfall
The Summary for Decision Makers from the Climate Prediction and Applications Centre of the Intergovernmental Authority on Development assigns north-eastern Kenya a 90 per cent likelihood of enhanced rainfall and provides sector guidance for agriculture, health, water, livestock, infrastructure and security.
National and county institutions need to prioritise preparedness across health, water, livestock, agriculture, infrastructure and security in the areas facing the highest rainfall probability.
The guidance strengthens the geographic and sector basis for preparedness while leaving the broader seasonal outlook unchanged.
Climate Prediction and Applications Centre of the Intergovernmental Authority on Development · Summary for Decision Makers11 September 2026 · Financing route remains unconfirmed
Kenya · prospective disaster-risk finance
Reuters reported that Kenya and the World Bank were finalising a rapid-finance framework that could cover an eligible El Niño emergency.
A signed instrument, eligibility decision and public allocation are required before the framework can be treated as available finance for preparedness or response.
The report identifies a prospective financing route. No primary project document, signed instrument, appropriation, amount or disbursement has been published.
Reuters · reported rapid-finance process11 September 2026 · Institutional responsibility clarified
Kenya · legal mandate and institutional responsibility
The Meteorology Act, National Drought Management Authority Act, Constitution and Disaster Risk Financing Strategy identify the principal mandates for forecasting, drought readiness, county functions and risk finance.
Public institutions need to identify who owns forecast services, contingency processes, local delivery and the passage from risk information to finance.
Institutional responsibility and the legal basis for financing can now be stated more precisely. The meteorological assessment is unchanged.
Meteorology Act, 202610 September 2026 · Immediate forecast horizon included
Greater Horn · near-term heat and operational conditions
The forecast for 8–15 September from the Climate Prediction and Applications Centre of the Intergovernmental Authority on Development provides short-term information for decisions about heat exposure, water demand, outdoor work and livestock care.
Health, water, labour and livestock authorities need to account for near-term heat exposure, water demand, outdoor work and animal care.
The weekly forecast informs immediate operating conditions while leaving the October–December assessment unchanged.
Climate Prediction and Applications Centre of the Intergovernmental Authority on Development · weekly forecast9 September 2026 · Seasonal outlook established
Kenya and the Greater Horn · October–December seasonal outlook
Regional and Kenyan seasonal outlooks established an October–December preparedness window for rainfall, flooding, drainage, pasture, water safety and continuity of essential services.
National and county authorities need to prepare for flooding, drainage pressure, pasture and water-safety risks, and disruption to essential services.
The seasonal signal was sufficiently clear to warrant continuing scrutiny of public preparedness and delivery.
Kenya Meteorological Department · October–December 2026 outlookCounty evidence retained from this revision
Baringo · Directive or readiness process
9 September 2026
A multi-agency team was reported to be assessing readiness around Lakes Baringo and Bogoria; the available report does not identify completed protective works.
Publish named sites, assigned works, responsible officers and completion evidence.
The county is named in the KSh2.1 billion livestock plan, but no public record of its allocation or release was found.
Citizen Digital · high-risk county preparationsNews report citing public authorities
Bomet · Directive or readiness process
11 September 2026
Flood hotspots were reported mapped in Chepalungu, Sotik and lower Bomet East, with public sensitisation and health-risk planning under way.
Publish the county plan, mapped sites, health measures, owners and implementation dates.
No county budget release or procurement record tied to this forecast was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Bungoma · Implementation gap reported
10 September 2026
Reporting on 10 September documented rain damage to homes and businesses and resident concern about preparedness, without identifying a fresh county measure in the review window.
Publish the county response plan, active mitigation work, emergency contacts and affected-site assessment.
No county budget release or procurement record tied to this forecast was found.
The Standard · Bungoma rain damage reportMainstream news report
Busia · Execution reported
23 August 2026
A current report documented secondary dykes along River Nzoia and the return of farming on previously flooded land in Budalang’i, while noting that some areas remain exposed.
Publish current dyke condition, uncovered settlements, maintenance work and evacuation arrangements.
The available source does not establish the funding or current maintenance expenditure for the dyke works.
Citizen Digital · Budalang’i preparedness reportNews report; works began before the stated review period
Elgeyo-Marakwet · Execution reported
31 August 2026
The county states that it started receiving planting and top-dressing fertiliser for short-season crops ahead of the El Niño rainfall period.
Publish quantities received, distribution sites, beneficiary coverage and delivery records.
The source and value of the subsidy, and expenditure evidence, are not published in the record.
County Government of Elgeyo-Marakwet · fertiliser receiptPrimary county record
Embu · Directive or readiness process
11 September 2026
Authorities were reported to have established a disaster preparedness committee to coordinate county preparations.
Publish the committee mandate, county plan, risk map, assigned actions and meeting decisions.
The county is named in the livestock plan, but no public record of a county allocation or release was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Garissa · Execution reported
7 September 2026
The county preparedness plan, hotspots and evacuation centres were reported mapped. Kenya Red Cross reported trained first-line responders, positioned supplies and equipment, and standby boats and vehicles.
Publish the plan, resource inventory, quantities, exact locations, county responsibilities and replenishment schedule.
The county is named in national health and livestock plans, but no public record of its budget, release or spending was found.
The Star · Garissa preparedness reportNamed official and response-partner statements
Homa Bay · National programme only
11 September 2026
The county is named in national health and livestock preparedness coverage, but no fresh county-specific implementation record was located in the review window.
Publish the current county contingency plan, assignments, flood works, stocks and delivery dates.
No public record of the county’s share, release or spending under the national programmes was found.
National livestock preparedness plan · reported county coverageNational programme coverage
Isiolo · National programme only
11 September 2026
The national livestock plan was launched in Isiolo and names the county for initial implementation, but no fresh county-owned action record was located.
Publish Isiolo’s assigned measures, county owner, target locations and delivery schedule.
No public record of the county’s share, release or spending under the livestock plan was found.
National livestock preparedness plan · reported county coverageNational programme coverage
Kajiado · Directive or readiness process
28 August 2026
A public preparedness process was reported around flood prevention, local risk identification and community action, with residents urged to act before the rains.
Publish the agreed county actions, responsible departments, works and evidence of completion.
The county is named in the livestock plan, but no public record of a county allocation or release was found.
Kenya News Agency · Kajiado preparedness reportGovernment news report
Kakamega · Directive or readiness process
8 September 2026
The county published an official advisory for enhanced October–December rainfall. The advisory establishes communication, not completed preparedness work.
Publish the county response plan, high-risk locations, responsible units and dated mitigation work.
No county budget release or procurement record tied to this forecast was found.
County Government of Kakamega · public advisoryPrimary county record
Kericho · Execution reported
11 September 2026
Kipkelion East and West were reported mapped for mudslide risk, while municipal boards were clearing stormwater drains and issuing relocation advice.
Publish work locations, work orders, progress, completion records and shelter arrangements.
No county budget release or procurement record tied to this forecast was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Kiambu · Directive or readiness process
10 September 2026
County and national officials were reported to have activated coordination around hotspots, early warning, public awareness and emergency response; earlier reporting called on water companies to clear drainage.
Publish the risk map, drain-clearance sites, responsible utilities, work progress and evacuation arrangements.
No county budget release or procurement record tied to this forecast was found.
Kenya News Agency · Kiambu preparedness reportGovernment news report
Kilifi · Execution reported
24 September 2026
The 11 September county report describes preparedness activity. Parliament’s 24 September notice adds a Malindi sanitation direction; reallocation and cleaning are municipal claims, with delivery still open.
Publish Malindi’s works roadmap, budget authority, payment and completion records, alongside county stock and evacuation evidence.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
Parliament of Kenya · Malindi oversight; earlier county report retained in revision 1.8Verified oversight; municipal implementation claims
Kirinyaga · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including local risks and assigned measures.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Kisii · Procurement initiated
7 September 2026
The county published a tender notice for the supply and delivery of El Niño preparedness materials for Community Health Promoters.
Publish the tender documents, evaluation outcome, award, contract value, delivery and distribution evidence.
Procurement is initiated; award, contract, payment and delivery are not established.
County Government of Kisii · tender noticeOfficial procurement record
Kisumu · Execution reported
11 September 2026
About ten evacuation centres in Nyando were reported prepared and stocked with food, non-food items, medical supplies, mosquito nets and waterborne-disease medicines.
Publish centre locations, stock inventories, custody records, access arrangements and the status of planned river and dyke work.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
Radio Generation Kenya · Nyando preparedness reportNamed administrator statement in a news report
Kitui · National programme only
11 September 2026
Kitui is named in the national livestock plan. Current farmer advice is public, but no fresh county-owned El Niño execution record was located in the review window.
Publish the county plan, agricultural measures, target locations, owners and delivery evidence.
No public record of the county’s share, release or spending under the livestock plan was found.
National livestock preparedness plan · reported county coverageNational programme coverage
Kwale · Directive or readiness process
11 September 2026
Authorities were reported to have identified flood-prone areas, worked with village elders on warnings and identified halls, churches and mosques for evacuation use.
Publish the county plan, verified shelter list, accessibility, responsible officers and readiness checks.
The county is named in the national health plan, but no public record of a county allocation or release was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Laikipia · Execution reported
4 September 2026
The governor reported that blocked drainage clearance had started, alongside identification of locations where residents might require assistance or relocation.
Publish cleared locations, work progress, evacuation sites, completion evidence and response ownership.
No county budget release or procurement record tied to this forecast was found.
People Daily · Laikipia preparedness reportGovernor statement reported by mainstream media
Lamu · Directive or readiness process
9 September 2026
The county reported a disaster preparedness workplan and convened a four-day multi-stakeholder training on early warning, anticipatory action and coordinated response.
Publish the workplan, resource allocation, evacuation sites, owners and evidence that planned actions have started.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
Kenya News Agency · Lamu disaster workplanGovernment news report citing county officials
Machakos · Directive or readiness process
27 August 2026
A county-led multi-agency meeting assessed high-risk areas and enforcement of development controls, including flood risks in urban areas.
Publish the risk map, enforcement instructions, assigned works, responsible units and implementation evidence.
The county is named in the livestock plan, but no public record of a county allocation or release was found.
Kitui Online · Machakos preparedness reportNews report citing county officials
Makueni · Directive or readiness process
Published 1 October 2026; event 30 September
A partners’ conference in Wote on 30 September identified a KSh152 million preparedness requirement. The county sought resources for evacuation and essential services; prior road and water-project planning remains open.
Publish approved contributions, releases, assigned measures, work orders and delivery dates.
KSh152 million is a projected requirement, not a verified appropriation, release or expenditure.
Makueni County Government · preparedness funding requirementPrimary county account of conference and proposed resources
Mandera · Directive or readiness process
1 September 2026
The county is developing a participatory scenario plan with the World Food Programme, county departments, the National Drought Management Authority and humanitarian partners to identify scenarios and early actions.
Publish the completed plan, selected early actions, responsible institutions, triggers and delivery timetable.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
County Government of Mandera · preparedness noticePrimary county record
Marsabit · National programme only
11 September 2026
Marsabit is named in the national livestock plan, but no fresh county-specific preparedness or execution record was located in the review window.
Publish the county contingency plan, local risks, assigned actions, resources and delivery evidence.
No public record of the county’s share, release or spending under the livestock plan was found.
National livestock preparedness plan · reported county coverageNational programme coverage
Meru · Directive or readiness process
11 September 2026
Landslide and flood hotspots were reported identified. A KSh29 million emergency allocation was reported for 2026/27, while the same report said no current-year emergency relief allocation was available.
Publish the hotspot map, response plan, current funding route, works and evidence of implementation.
KSh29 million is reported in the 2026/27 budget, but no public record of its release or spending was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Migori · Execution reported
17 August 2026
The county was reported to have allocated KSh44.2 million and purchased relief supplies including food and non-food items; residents later called for early mitigation in Nyatike.
Publish the budget line, stock inventory, storage, custody, distribution rules and flood-mitigation work.
KSh44.2 million and purchases are reported; release, payment and inventory records were not publicly available for this assessment.
Kenya News Agency · Migori emergency preparednessGovernment news report
Mombasa · Directive or readiness process
12 September 2026
The governor issued a restriction on roadside construction mixing from 14 September and announced a phased 3,000-person deployment to clear drains, culverts and waterways after local flooding disrupted access.
Verify enforcement, recruitment, training, tools, deployment sites and completed clearance before heavier rainfall.
A KSh20 million emergency allocation is separately reported, but no public record of its release or spending was found.
Kenyans.co.ke · Mombasa flood-prevention directiveGovernor statement reported by mainstream media
Murang’a · Execution reported
11 September 2026
Youth Service teams were reported deployed to clear drainage in major towns. The report also identified blocked sewer and feeder-road drainage gaps.
Publish deployment sites, work progress, completion records and action on the identified drainage gaps.
KSh27.7 million is reported for disaster management and social welfare, but no public record of its release or spending was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Nairobi · Execution reported
21 August 2026
Ongoing drainage and flood-mitigation works were reported across vulnerable areas under a multi-agency programme, with hotspot mapping and emergency coordination also active.
Publish the full site list, contracts, progress certificates, expenditure and completed-work verification.
A KSh2.4 billion programme and KSh2 billion drainage component are reported; release and expenditure are not established here.
Citizen Digital · Nairobi flood-preparedness programmeNews report citing county programme information
Nakuru · Execution reported
9 September 2026
The county reported a multi-agency response, bridge structural assessments across 11 sub-counties and planned immediate dredging and culvert unblocking in Naivasha.
Publish assessment findings, work orders, start and completion evidence, and high-risk settlement arrangements.
No county budget release or procurement record tied to this forecast was found.
Kenya News Agency · Nakuru response measuresGovernment news report citing county officials
Nandi · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including landslide and flood risks and assigned measures.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Narok · Directive or readiness process
3 September 2026
County preparedness around vulnerable communities, flood and landslide hotspots and critical infrastructure was reported; prior stormwater works and raised footpaths were cited in exposed areas.
Publish the current plan, hotspot map, condition of previous works, response resources and delivery dates.
The county is named in the livestock plan, but no public record of a county allocation or release was found.
The Standard · Narok preparedness reportMainstream news report
Nyamira · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including local risks and assigned measures.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Nyandarua · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including slope, lake and drainage risks and assigned measures.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Nyeri · Execution reported
11 September 2026
KSh20 million was reported set aside; schools were identified for evacuation use, drainage improvements were reported in Mathira and Kieni, and each sub-county was said to have an ambulance.
Publish the budget line and release, named centres, drainage-work progress, ambulance readiness and exercise records.
KSh20 million is reported, but no public record of its release, procurement or spending was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Samburu · National programme only
11 September 2026
Samburu is named in the national livestock plan, but no fresh county-specific preparedness or execution record was located in the review window.
Publish the county contingency plan, pastoralist risks, assigned actions, resources and delivery evidence.
No public record of the county’s share, release or spending under the livestock plan was found.
National livestock preparedness plan · reported county coverageNational programme coverage
Siaya · Directive or readiness process
8 September 2026
The county convened a multi-sectoral session to refine its Multi-Hazard Contingency Plan, validate mapped risk zones and define early-warning and response arrangements.
Publish the revised plan, departmental emergency budgets, mitigation works, owners and delivery dates.
Named in national health and livestock plans; dedicated departmental budgets were identified as a need, not a completed release.
County Government of Siaya · preparedness meetingPrimary county record
Taita Taveta · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including slope, river and settlement risks.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Tana River · Directive or readiness process
11 September 2026
The county and partners were reported to have prepared sector-specific advisories for safety and early action, with dissemination planned through radio, barazas, community structures and digital channels.
Publish the advisories, current contingency plan, evacuation sites, responsible actors and evidence of delivery to exposed communities.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Tharaka-Nithi · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including slope, river and road risks.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Trans Nzoia · Directive or readiness process
11 September 2026
Emergency committees were reported activated, flood and landslide areas mapped across all five sub-counties and volunteers trained, while a spot check found no repair under way on damaged Kitale drainage.
Publish the county plan, training completion, drainage works, evacuation routes, owners and delivery dates.
No county budget release or procurement record tied to this forecast was found.
Radio Generation Kenya · multi-county preparedness reportNews report with implementation spot check
Turkana · Directive or readiness process
3 September 2026
The County Steering Group began multi-agency contingency planning, with a command centre, lead agency, resource mobilisation and pre-positioning still framed as recommendations.
Publish the completed plan, command-centre status, lead agency, stock positions, evacuation sites and assigned early actions.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
County Government of Turkana · steering-group recordPrimary county record
Uasin Gishu · Execution reported
11 September 2026
Heavy machinery was reported deployed in Kapseret, Kesses and Turbo to clear waterways, open drainage routes and remove silt from culverts.
Publish work orders, exact sites, progress and completion evidence, and planned safety-centre readiness.
No county budget release or procurement record tied to this forecast was found.
Radio Generation Kenya · multi-county preparedness reportNews report
Vihiga · No fresh local evidence
Checked 12 September 2026
No county plan, directive, procurement notice or implementation report was found for the review period.
Publish the county response strategy required by the national direction, including slope, drainage and public-health risks.
No county budget release or procurement record tied to this forecast was found.
National all-county preparedness directionNo county source found for the review period
Wajir · Procurement initiated
14 September 2026; reviewed 2 October
The national water-works agency advertised Masalale–Kilkey flood-control works in Eldas. Earlier county emergency planning remains part of the record; neither establishes completion.
Establish evaluation, award, contract, work schedule and completed outputs. County stock placement and vaccination also remain open.
The agency states funds were received; no amount or release trail is supplied. KSh3 million is tender security, not project finance.
Northern Water Works Development Agency · official tenderPrimary procurement notice; national agency, not county government
West Pokot · Directive or readiness process
3 September 2026
The county activated departments and disaster structures, validated a risk-assessment tool and planned field assessments, scenario planning and community sensitisation.
Publish field-assessment results, scenarios, assigned early actions, local owners and implementation evidence.
The county is named in national health and livestock plans, but no public record of a county or programme release was found.
The Star · West Pokot preparedness reportNamed county statements in a news report